Supply & Installation

supply

REA has an authorized and systematic methodology which is applied for design, manufacturing, logistics, installation and related processes of unitized curtain walling system. Our method statement covers the entire scope of work, which include

  • Approved Architectural Drawings, Structural Drawings and Specifications
  • Site Establishment of the main contractor
  • Access route to the site for delivery and special vehicles
  • Location of site storage areas and sizes (short/long term)
  • Cranes, Hoist size, location and capacity
  • Schedule of cranes, hoist time and availability, free and interrupted use of tower cranes
  • Vehicle/ passenger goods hoist to permit distribution of materials and personnel to floors
  • Protection of work between substantive completion and practical completion of work
  • Size and allocation of site offices
  • Safety Regulation from main contractor for site activities
  • Site power Supply layout and specifications

LABORATORY MOCK-UP AND TESTING
All architectural designs are validated by the REA by performing necessary tests on mock-up samples. These tests are conducted by third parties in front of a representative from the client. As facade specialists, REA's Technical and Engineering team reviews the project specification and testing requirements. A selected Independent Testing Agency prepares a Method Statement which is reviewed by the client's representative. Installation of the sample elements is conducted at an Independent Testing Laboratory and is arranged and monitored by REA's Technical and Engineering team, Installation team and QA/QC Test Coordinator. The tests are recorded and reports are prepared accordingly.

FIELD TESTING
REA's QA/QC and Installation Team review project specification for field testing requirements. The testing is facilitated in collaboration with a client representative. REA provides Method statements for the testing, approved by the client representative. Either REA QA/QC Test Coordinator or the Independent Testing Agency carry out the tests in accordance to the approved Method statement, Inspection and Test plans and internationally recognized standards. The test report is prepared either by the Test Coordinator or the Independent Testing Agency.

 

2016 ACHIEVEMENTS

2016 has been a successful year for REA as we would like to take this moment to highlight some of our outstanding achievements.

Our most telling achievement was growth of the company from 1,988 employees reaching 2,502 employees, with an increase of 514 which strengthen REA’s capabilities and capacity to deliver the increase number of our projects.

Reem Emirates Glass division of REA have undertaking major production uplift by successful installation of a new (DGU) Double Glass Unit & Tempering Line facilities; which has enabled the firm to achieve 100% production capacity.

In order to diversify our products lines REG have successfully installed Ceramic Fritting Glass machine to fulfill all printing glass requirements in-house and improve the supply chain cycle on glass products.

Project Handovers in 2016:
Al Jazeera Tower – (Abu Dhabi)
Viceroy Hotel Palm Jumeirah - (Dubai)
City Walk Hotel - (Dubai)
Saraya Towers - (Abu Dhabi)
Zone K - (Abu Dhabi)
 
Awarded Projects in 2016:
Opera Grand Tower, Emaar – (Dubai)
Vida Residence, Emaar - (Dubai)
Tiara United Towers, Al Wasel/Meras - (Dubai)
Serenia Residences – Banian - (Dubai)
Palm Tower – Nakheel - (Dubai)
Axis Tower – Hansen Façade – (UK)
19 Duncan Street – (Canada)
 
Current Progress on Ongoing Projects:
98% completion of 2000 Villas - (Al Ain)
95% completion of Akoya Villas - (Dubai)
91 % completion of 3000 Villas - (Al Ain)
82% completion of MBS Crown Plaza – (UK)
71% completion of W Hotel - (Dubai)
66% completion of Seventh Heaven - (Dubai)
64% completion of City of Light – (Abu Dhabi)
60% completion of Ashjar - (Dubai)
57% completion of Serenia - (Dubai)
20% completion of Axis Tower – (UK)
13% completion of JVC (Suites in the SKAI) - (Dubai)
10.00% completion of Palm Tower - (Dubai)
3% completion of Nad Al Sheba- (Dubai)