Login Pop-up

+971 2 599 4200

Viceroy Hotel

About Project: The project contains one of the largest gate openings in the world which is located through the core of the hotel design. The incline unitized curtain wall on the gate considered as one of the fantastic features on the building due to its complex unitize curtain wall façade design. Aluminum doors and windows are high-end quality in the market which includes automatic corner sliding doors, large and wide doors with slim profile have been used to provide tenants with the largest possible sea view of the Arabian Gulf. The project is an integrated hotel and residential development located on the main trunk of the Palm Jumeirah, Dubai, and UAE. The Hotel Towers have an L-shape floor plate and are configured with shear walls and a central core. It is envisaged that partitions between bedrooms and corridor are used as shear walls to stiffen up the building.

Client: SKAI Luxury Real Estate Development LLC

Location: Dubai

Status: Ongoing


Photos

Video

 

2017 ACHIEVEMENTS

As another year comes to an end, we would like to take this opportunity to wish you all a Rewarding, Joyous New Year upon you and your loved ones. Since 2017 have been successful year for REA, it’s worth to highlight some of 2017 accomplishments;

Projects Handover

  • 2000 Villas
  • Akoya Villas
  • 3000 Villas
  • C15 – Reem Island
  • Viceroy Hotel
  • Serenia Residence
  •  MBS Crowne Plaza

Projects Awarded

- Masdar Neighborhood Institute

Projects Progress

  • 98.0% on W- Hotel.
  • 93.0% on Axis Tower.
  • 70.0% on Seventh Heaven.
  • 67.0% on Nad Al-Sheba
  • 58.0% on Ashjar.
  • 43.0% on Suit In The Skai Tower 1.
  • 43.0% on The Palm Tower.
  • 36.0% on Tiara United Tower.
  • 15.0% on Vida Residences.
  • 7.0% on Opera Grand.

Events

  • REA launches AIM (All Ideas Matter) employees suggestion scheme.
  • Tiara towers performance Mock Up test passed from first attempt at Exova testing lab in Dubai.
  • successful 2 years of REA in Bangalore, participating in Design of landmark projects in Dubai.
  • Sharjah University visit Reem Emirates Aluminum.
  • Reaching last floors installation of REA's Unitized Curtain Wall on MBS Crown Plaza project, Manchester City, UK.
  • The Palm tower performance Mock Up test passed from first attempt at Exova testing lab in Dubai.
  • Successful Civil Defense Drill in Reem Emirates Aluminum Factory.
  • REA is pleased to recognize the dedicated workers for their high performance and commitment.
  • Final Completion at Serenia Residences Project on Jumeirah Palm Dubai.
  • Strong presence for Reem Emirates Aluminum and Hansen Facades at Zak World of Facades UK 2017.
  • 19 Duncan Street performance Mock Up test passed at Exova testing lab in Dubai.
  •  Reem Emirates Aluminum employees were honored to visit Wahat Al Karama (Oasis of Dignity).
  • Open panel discussion about Artificial Intelligence in Future Cities and Smart Manufacturing delivered by Eng. Naser Almarzooqi, Reem Emirates Aluminum GM at GITEX 2017 Dubai.
  • VIDA tower performance Mock Up test passed at Exova testing lab in Dubai.

We thrived because of your incredible hard work, creativity, and dedication. I am personally grateful to each one of you for your tremendous efforts. Through your commitments and efforts, REA has been capable of sustaining its position in the market as a leading Façade Company in UAE, with high and robust potentials in global markets. We will continue to provide high-quality façade solutions achieving clients’ retention and satiation.

Every day, your support makes REA’s growth possible and I look forward to a successful, positive and productive year.
Thank you for your efforts in 2017 and welcome 2018 with its challenges.

CONTACT
Scroll to top